🍪 Tasty Cookies: This website uses cookies to improve your experience. You can opt in or out. See our privacy policy.  

Dia 7008 Custom Information Board - Zintec Face Only - Dry Wipe

  • £33.74 Ex VAT 
  • Inc VAT: £40.49
Product Code
Choose Option
Looking for larger quantities?

  • Secure Shopping High Security Checkout.

Available Options


  • Availability: Choose an option...
  • Brand: Start Traffic

750 x 750mm Zintec Dry Wipe Custom Courtesy Board / Notification Boards (face only)

When carrying out planned roadworks it's important to display an information board for the public to read. These signs typically say who is carrying out the work, the expected date of completation and include an emergency contact number. This particular variant of this sign incorporates these with dry wipe areas so the signs can be used for multiple jobs or changed on site if required.

Key Features:

  • Customisable Company Name
  • Customisable Job Description
  • Dry wipeable Contractor Name
  • Dry wipeable Expected Completion Date
  • Dry wipeable Emergency Telephone Number
  • Dry wipeable Permit Number
  • Apology for the inconvenience
  • 750x750mm Zintec metal sign face

What the Red Book says

Page 23 of the October 2013 Safety at Streetworks guide (the Red Book) gives a clear example and guidance on the design and use of information boards during road works.

"An information board must be displayed at every street and road works site except mobile works, short duration works and minor works that do not involve excavation. Information boards are still highly desirable at these sites where it is safe and practicable to provide them. This board should be placed so that it does not obstruct footways or carriageways but can be clearly read by pedestrians, and any drivers who have stopped close to the board. The information board must give the name of the organisation undertaking the works, any principal contractor and an emergency contact telephone number. Wherever practical, it should also contain other information that will be helpful in explaining to the public why the work is being done, how long it will take and a message apologising for inconvenience.

For mobile and short duration works that do not involve excavation or advance signing, information may be displayed on works vehicles, so long as it does not cause a distraction to drivers."

What the Traffic signs manual (Chapter 8) says

Extracted from Part 1: Design of the Chapter 8 Traffic Signs Manual (D4.15.5)

"This sign for pedestrians gives details about the nature of street works, giving name of employer and contractor, emergency telephone number, and apology for inconvenience. Signs must be sited where they will not cause an obstruction."

 


Specifications

Dimensions
Width 750mm
Height 750mm
Material
Sign Substrate Zintec

Customer Questions & Answers

Be the first to ask a question.

Contact Us

Weekdays 8:30AM to 5PM

Address:

Start Safety, Drury Lane,
Martin Hussingtree,
Worcester, WR3 8TD

Phone:

+44 (0)1905 794875

Email:

Send Us An Email

Testimonials

Where We Are

Google Maps